Design and Construction Management of Ta

  • Home
  • Projects
  • Infrastructure, Environment
  • Design and Construction M

Project Information

  • Years: (2014-2018)
  • Location: Tubas - palestine

Design and Construction Management of Tayasir Wastewater Treatment Plant and Associated Collection Networks and Reuse Components for Tubas, Aqqaba and Tayasir Communities

The task included the preparation of conceptual, preliminary and detailed design for sewerage collection networks in Tubas, Aqqaba and Tayasir with house connection and for the wastewater treatment plant and reuse scheme including reservoirs and dam. The capacity of the WWTP is about 5,000 m3/day and the length of the networks collection system is about 70 km. The works include preparation of drawings, compiling standard details, technical specifications, bills of quantities, construction cost estimates and all tender documents for all components of the system. CEP scope includes also the construction management of all above cited components. Client: Ministry of Finance / Palestinian Water Authority (PWA) funded by the European Union (EU).